Indian tunnel rescue team makes progress at flood-hit Chilime: A practical reader guide

Indian tunnel rescue team makes progress at flood-hit Chilime: A practical reader guide

The Indian tunnel rescue team, who are continuing to work alongside with Nepalese Army have made a temporary track inside the Chilime tunnel in flood-hit Rasuwa district to allow more heavy equipment to reach the affected areas, authorities said on Saturday (September 5, 2026).

A temporary track is also being made to allow more heavy equipment to reach the tunnel, and doctors with the team held a health camp for the local community,” Indian Ambassador to Nepal Naveen Srivastava said in a post on X on Saturday (September 5, 2026). At least 900 workers are missing from a dozen hydropower projects in Nepal, with about 500 believed to be inside tunnels, officials said. According to a report presented by the National Disaster Risk Reduction and Management Authority (NDRRMA) on Friday, the devastating flash floods have affected more than 32,000 people and damaged roads, bridges, schools and healthcare facilities.

“The Indian tunnel rescue team, working alongside the Nepali Army, dug deeper into the Chilime tunnel yesterday, draining out water.